Rare Opportunity to own this turnkey home with a covered patio and absolutely gorgeous views of the Rancho California Golf Course (formerly the SCGA) from the kitchen, family room and back yard! This highly sought after turnkey home backs up to the 11th fairway and is located in "The Greens" golf course community. It is a 2720 sq ft, 5-bedroom, 3-bathroom home with a 3-car tandem garage on a private cul-de-sac. You will find a laundry room with a utility sink, and a bedroom with an adjacent bathroom on the main floor! The kitchen has stainless steel appliances, granite countertops, a 5-burner gas cooktop, double oven, a built-in microwave, plenty of cabinet space and a "kitchen island" which has counter seating that has a double sink. The kitchen is open to the family room where you can relax in front of the fireplace on those cold nights. The living room is open to the formal dining room area with tall ceilings. There are ceiling fans throughout this home; the yard includes lemon, lime, peach and pomegranate trees! Within minutes of Old Town Temecula, walking/hiking trails, lakes, wineries, shopping, breweries, dining and the annual Balloon and Wine Festival. This home is located in a distinguished school district and has easy freeway access, no HOA and a low tax rate! Attention Veterans: VA assumable loan at 4.49%!!
Floor plans
30005 Mickelson Way
Murrieta, CA 92563
For Sale
$775,000
Square feet
2,720
Lot size
6098.00
CRMLS
#ND25227611
Days on market
45
Features & Details
Beds
5
Baths total
3
Baths full
3
Bathroom Features
Bathtub, Shower, Shower in Tub, Corian Counters, Double Sinks in Primary Bath, Separate tub and shower, Tile Counters, Walk-in shower
Cooling
Central Air
Entry level
1
Equipment
Dishwasher, Double Oven, Gas Cooktop, Microwave, Self Cleaning Oven
Fencing
Wood, Wrought Iron
Fireplace
Family Room
Flooring
Carpet, Wood
Heating
Central, Fireplace(s), Natural Gas, Solar
Interior features
Ceiling Fan(s), Granite Counters, High Ceilings, Recessed Lighting
Kitchen Features
Granite Counters, Kitchen Island
Parking Features
Driveway, Garage Faces Front, Garage - Two Door, Tandem Garage
Parking Garage Spaces
3.00
Patio
Concrete, Deck, Patio, Wood
Rooms
Family Room, Kitchen, Laundry, Living Room, Main Floor Bedroom